http://www.madeinwst.com
Home > Products > Tower > Provide Oem Service Name Body Of Tower

Provide Oem Service Name Body Of Tower

    Payment Type: L/C,T/T,Paypal
    Incoterm: FOB,CFR,CIF
Basic Info

BrandWST

Additional Info

PackagingUnpackaged

TransportationOcean

Place of OriginWuxi City,China

Payment TypeL/C,T/T,Paypal

IncotermFOB,CFR,CIF

Product Description

Provide Oem Service Name Body Of Tower, Tower that is the shell of the Tower Equipment, common tower by the diameter, such as the thickness of the cylinder and the upper and lower head composition. For large-scale tower equipment, in order to save materials are also used from unequal diameter, ranging from the thickness of the tower.
Tower equipment is usually installed outdoors, so the tower in addition to bear a certain operating pressure (internal or external pressure), temperature, but also consider the wind load, seismic load, eccentric load. In addition to meet the test pressure, transportation and lifting of the strength, stiffness and stability requirements.

Rectification Tower operation:

Liquid flooding

(1) the tower bottom temperature is high, the tower ascending steam flow is too large; reduce or stop the feed, reduce the bottom temperature, to stop the top of the product delivery, full reflux operation, so that the top of the heavy component down to the bottom . When the production does not allow to stop feeding the bottom temperature can be reduced, should increase the bottom of the mining.

(2) the amount of feed or back flow is too large, tower overload; appropriate to reduce the amount of feed or return flow, and then adjust.

Tower body


2 Tower Feed Interruption:
(1) the feed pump fails to stop; immediately enable the standby pump.
(2) instrument failure: change the manual or vice-line operation, contact the instrument processing.

(3) raw materials, interruption of feed;

3 Tower Return Interruption:
(1) return pump self-stop failure: immediately enable standby pump, such as the two pumps are bad, you should stop processing.
(2) instrument failure: change the manual or vice-line operation, contact the instrument processing.
(3) refluxing tank no liquid surface, so that the return pump pumped out;
① When the pump is exhausted, pump should be closed to stop the pump valve, such as pump heat, the gas pump body, the gas should be discharged to the low-pressure gas line.
② return tank with liquid surface, the establishment of return flow adjustment operation.
③ return to interrupt, pay special attention to system temperature and pressure, to prevent over-temperature and overpressure.
(4) reflux tank pressure control failure, pressure drop, so that the pump evacuation. Adjust the pressure control valve to improve the pressure of the reflux tank.
4. Overpressure at start:
(1) heating too fast: reduce the heating rate or pressure relief to normal.
(2) the top of the mining system is not open process: careful inspection, change the process.
(3) air-cooled fan is not open or not open spray water; immediately start the air-cooled, spray spray spray spray pump.
(4) cooler did not cycle water: circulating water circulation system as soon as possible.
(5) the top of the cold back to the flow of small or not established: as soon as possible to establish a cold return to regulate the return flow, control tower top temperature.
Overpressure in normal production:
(1) bottom of the heating rate is too fast: reduce the bottom temperature or pressure.
(2) tower temperature control failure:
① switch to vice-line control, contact meter processing
② When necessary, turn off the Reboiler steam, cooling, blood pressure, when the temperature, pressure, and then return to normal production.

(3) tower backflow control valve failure.

Product Categories : Tower

Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters
Communicate with Supplier?Supplier
VIVI Ms. VIVI
What can I do for you?
Contact Supplier